+86-21 37651856

All Categories

News&Events

300 MW / 1,200 MWh Nighthawk Battery Storage Project Begins Operations in California
17 Aug 2026

300 MW / 1,200 MWh Nighthawk Battery Storage Project Begins Operations in California

August 2026 | Industry News California continues to expand its large-scale energy storage infrastructure as electricity demand grows and renewable energy becomes an increasingly important part of the state's power mix. On August 12, 2026, Arevon Ener...

NVIDIA Advances 800V DC Power Architecture for Next-Generation AI Factories
10 Aug 2026

NVIDIA Advances 800V DC Power Architecture for Next-Generation AI Factories

August 2026 | Industry News The rapid expansion of artificial intelligence is changing not only how data centers compute, but also how they are powered. As AI servers become increasingly power-intensive and rack-level power requirements continue to r...

Congo Copper Export Restrictions Add New Pressure to Global Copper Supply
05 Aug 2026

Congo Copper Export Restrictions Add New Pressure to Global Copper Supply

August 2026 | Industry News The global copper market is facing another source of supply-side uncertainty following the Democratic Republic of Congo's (DRC) decision to prohibit exports of copper and cobalt concentrates. The measure represents a signi...

UK Customer Sunswap Visits Kinto for Manufacturing and Engineering Exchange
01 Aug 2026

UK Customer Sunswap Visits Kinto for Manufacturing and Engineering Exchange

July 31, 2026 | Company News Kinto was pleased to welcome the team from Sunswap, a UK-based manufacturer of electric transport refrigeration technology, to our manufacturing facility in China on July 31, 2026.The visit provided an opportunity for bot...

AI Data Centers Are Driving a New Wave of Copper Busbar Demand
27 Jul 2026

AI Data Centers Are Driving a New Wave of Copper Busbar Demand

Rising AI Computing Power Is Reshaping Power Distribution InfrastructureArtificial Intelligence (AI) is rapidly transforming industries worldwide, but behind every AI model lies an enormous amount of computing infrastructure. As hyperscale data cente...

New Energy Continues to Drive Global Busbar Industry Growth
20 Jul 2026

New Energy Continues to Drive Global Busbar Industry Growth

Electrification Is Creating New Opportunities for Custom Busbar ManufacturersThe global transition toward cleaner energy continues to reshape the electrical equipment industry. While electric vehicles remain one of the strongest growth drivers, deman...

7 Common Busbar Design Mistakes and How to Avoid Them
20 Jul 2026

7 Common Busbar Design Mistakes and How to Avoid Them

IntroductionEven well-designed electrical systems can experience overheating, excessive voltage drop, or premature connection failure if the busbar is not properly engineered. Many of these issues are not caused by material defects but by avoidable d...

Global EV Busbar Market Continues to Grow with 800V Platform Adoption
15 Jul 2026

Global EV Busbar Market Continues to Grow with 800V Platform Adoption

The Shift to 800V EV Architectures Is Reshaping Busbar DesignThe global electric vehicle (EV) industry continues to evolve at an impressive pace. While vehicle sales remain one of the most closely watched indicators, another important trend is taking...

Copper Busbar vs Aluminum Busbar: How to Choose the Right Material for Your Application
15 Jul 2026

Copper Busbar vs Aluminum Busbar: How to Choose the Right Material for Your Application

IntroductionSelecting the right conductor material is one of the first decisions engineers make when designing a power distribution system. Copper and aluminum are the two most commonly used busbar materials, each offering distinct advantages dependi...

Get Free Custom Busbar Quotation

Submit your busbar drawings, specifications, or project requirements via the inquiry form below. Our engineering team will conduct a DFM analysis and provide a quotation based on your drawings.

Our Address

  • 4th Plant. No. 333 Chihua Road, Zhelin Town, Fengxian District, Shanghai, China
  • +86-21 37651856
  • [email protected]

Get a Free Quote

Our representative will contact you soon.
Email
Mobile
Name
Company Name
Message
0/1000
Attachment
Please upload at least an attachment
Up to 3 files, each no larger than 30MB. Supported formats: jpg, jpeg, png, pdf, doc, docx, xls, xlsx, csv, txt, stp, step, igs, x_t, dxf, prt, sldprt, sat, rar, zip.